   The Khobi 2 project is located on the Khobistskali River in the
northwest of Georgia, in the Samegrelo ‐ Zemo Svaneti region.
Main characteristics :
• 44,5 MW run-of-river hydropower plant
• 200,000,000 Kw/H Annual Power Generation

  277 m head, 21 m3/s design flow

• 1.3 m3/s ecological flow
• 10m high concrete weir - gated spillway - fish pass
• 6.6 km 3.5m diam water headrace tunnel TBM excavated
• 660m surface steel penstock
• 2 x 23,2 MW vertical Pelton turbines - surface powerhouse
• 18 km HT transmission line to Jvari 500 kV substation.
• Total Investment 93,5 Million USD ( Equity :  27 Mil USD.   Debt : 66.5 Mil. USD)

Distribution

Office

Warehouse

Commercial Space

  • About
  • Brand
  • Area

    

    Soleolica Electrci SL was established in 2023 by four corporate groups, including 2 renewable energy companies
with 20+ years of international experience (www.peri.ge; www.hydrocorp.ge). Together We implemented more
than 50 renewable energy projects, including technical studies of the HPPs, feasibility studies and preliminary
project designs, performed valuations, due diligence and economic analysis of renewable energy projects.
During the last 20 years, Peri LLC has implemented more than 300 MW of Hydro Power projects and currently
is completing the implementation of 205 MW ofWind power and 50 MW Solar PV projects.
Hydrocorp were also involved in the management of HPPs’ construction and their supervision, planning and
consultancy of operations. We have made the evaluation of energy projects and the energy companies. We
provide consultancy services to TBC Bank, the EBRD, World Bank, Georgian Capital and other local and
international financial institutions

Soleolica Electric

Office

Warehouse

Commercial Space